The Department of Transport and Main Roads (TMR) would like to advise that road pavement works will take place eastbound on Samford Road at the intersection with Blackwood Street, Mitchelton.

While works are underway, a detour will be required for one night.

These works involve rectifying defects in the work undertaken at this location in early June 2023 and are being undertaken as part of TMR’s routine maintenance program to improve the road surface and enhance road safety for all road users.

Work activities

  • Removal and replacement of asphalt.
  • Reinstatement of line marking.

Timing

  • Works will take place late October 2023 and are expected to take one night to complete, construction and weather conditions permitting.
  • Typical construction hours will be from 8pm to 5am, Sunday to Friday. Night works are required for road user safety, and to avoid what would otherwise be extensive traffic queuing and disruption to the road network. While most of the works will be undertaken at night, some Saturday or other out of hours works during the day may be required.
  • While works are underway, temporary closure at the Samford Road and Blackwood Street intersection will be required for one night between 9pm and 5am, detours will be in place as follows:
    • Access to Blackwood Street from Samford Road will be detoured as follows:
      • Eastbound traffic on Samford Road will be detoured via the signalised intersection at Osborne Road and via Pascoe Street.
      • Westbound traffic on Samford Road will be detoured via the signalised intersection at Ellworthy Street and via Grovely Terrace.
    • Access to Samford Road from Blackwood Street will be detoured via Grovely Terrace and Ellworthy Street.
  • During these periods, motorists shall be directed via appropriate detour signage.

Expected impacts

  • Changed traffic conditions: Temporary traffic detours, lane and road closures, temporary speed limit reductions and short-term traffic disruptions. Please allow extra time when planning your travel and follow the directions of roadside signage and traffic controllers.
  • Temporary construction noise: Heavy machinery will be in use and nearby residents and businesses can expect increased noise, dust and odour. Reversing beepers and flashing lights will be used for safety.
  • Access to private properties: Access to private properties will be maintained during the works. Where temporary access changes are required, property/business owners will be contacted directly.

On completion, TMR officers will continue to review the site for up to three months. During this time TMR will assess the work undertaken for longevity and quality.

Every effort will be made to minimise impacts on the local community and surrounds.

TMR appreciates your patience and cooperation while these important works are carried out.

The event is finished.

Date

29 Oct 2023 - 03 Nov 2023
Expired!

Time

8:00 pm - 5:00 am
Category

Organizer

Department of Transport and Main Roads
Phone
13 19 40
Website
http://www.qldtraffic.qld.gov.au
Menu