
Half Road Closure – Stenner Street, Darling Heights
HALF ROAD CLOSURE – DARLING HEIGHTS
Mirait Technologies as well as Traffic Control Innovations will implement a Half Road Closure of Stenner Street, Darling Heights (westbound) in between Gorman Street and Luck Street for the purpose of manhole reconstruction works.
The closure will occur on the below date range:
- Monday 15th April 2024 – Wednesday 24th April 2024
Closure will only be in place between 6:30am – 6:30pm Monday to Saturday
Traffic controllers will be onsite to assist members of the public if required.
There will be no through road.
A detour will be in place and will need to be followed. Westbound general traffic detoured via Gorman Street, Wuth Street, and Luck Street; eastbound general traffic detoured via West Street, Alderley Street, and Drayton Road; and pedestrians detoured via existing roundabout crossing points.